Click here to make tpub.com your Home Page

Page Title: Detail specification
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-5238C
REQUIREMENTS
3.
3.1 First article.  The pump assemblies furnished under this specification
shall have been inspected and passed the First Article Inspection specified
herein.
3.2 Detail specification.  A specification providing design and performance
requirements shall be submitted by the contractor to the procuring agency for
approval.  The detail specification shall reiterate all basic requirements
of this specification, shall use the same paragraph headings and numbers, and
shall insert all applicable specific and special requirements according to
this format.
3.2.1 Drawing.  At the site designated for First Article review, the contractor
shall have available all drawings for Government inspection.  This shall include
but not be limited to:  top drawing, assembly drawings and that data delineated
thereon, e.g., specifications, manufacturing instructions, etc.  All drawings
shall be prepared in accordance with MIL-D-1OOO, as specified in the contract.
3.2.2 Calibration data.  The detail specification shall include specific
performance charts and data on power input, fuel flow, output pressure, and
the maximum operational altitude.
3.2.3 Climb performance.  The detail specification shall establish the minimum
pump output requirements during and following a maximum rate of climb with fresh
unweathered fuel at a temperature no less than 125F.
3.2.4 Temperature.  The detail specification shall state the applicable ambient
and fuel temperature class of MIL-F-8615.
3.2.5 Fuels.  The detail specification shall state the principal fuel and
other fuels expected to be encountered in use.  In normal operations, it shall
be assumed that the fuels contain various quantities of dissolved and free
water, salts, gases, solid contaminants and up to 30 percent aromatics.
3.3 Components.  The pump shall consist of a pump and a driving motor, assembled
as an integral unit.  The motor may be electric or hydraulic.
3.4 Standards and specifications.  Standards nnd specifications for commodities
and services not specified herein, shall be selected in accordance with MIL-STD-143.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business