Click here to make tpub.com your Home Page

Page Title: Functioning
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-63315 (AR)
6.5.1 Functioning.  One hundred sixty (160) pressure cartridges
shall be selected from each lot and subjected to the hot and cold
functioning test specified in 4.5.8; eighty (80) at each temperature.  If
two (2) or more of the eighty pressure cartridges fail to comply with the
applicable cold or hot functioning requirements, including duds, the lot
shall be rejected.  If any lot is rejected, all data generated shall be
forwarded to Commander, ARRADCOM, ATTN:  DRDAR-QAA-Q, Dover, NJ 07801
(Destructive test).
6,6 Drawings.  Drawings listed in Section 2 of this specification
under the heading U.S. Army Armament Research and Development Command
(ARRADCOM) may also include drawings prepared by and identified as
Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal or Picatinny
Arsenal drawings.  Technical data originally prepared by these activities
are now under the cognizance of ARRADCOM.
6.7 Data submission.  Results of all tests performed by the
contractor including copies of pressure/time traces shall be submitted in
accordance with Data Item DI-R-1721 on the DD Form 1423 for the
contract.  Distribution shall include the following:
Commander
ARRADCOM
ATTN: DRDAR-QAA-Q
Dover, NJ
Custodian:
Preparing Activity:
Army-AR
Army-AR
Project No:
1345-A-224
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business