Click here to make tpub.com your Home Page

Page Title: Examination of first echelon repair parts
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-82442(OS)
4.3.3
Examination of first echelon repair parts.  The sampling
plans and procedures set forth in MIL-STD-105 shall be used in the
determination of acceptability of first echelon repair parts for the
pump as specified in 4.7 through 4.7.4.
4.4
Preproduction
inspection.
4.4.1
Tests and examinations.  The preproduction sample of 3
pumps shall be subjected to the acceptance tests defined in 4.5.4.1 and
4.5.4.2 and subsequently shall be inspected in accordance with Table IV,
with 1 pump being tested in accordance with each of the 3 test sequences,
A through C.
TABLE IV
PREPRODUCTION TEST SEQUENCE
4.4.2
Test conditions.  Unless otherwise specified, the pump shall
be subjected to the tests in 4.4.1 under the following conditions:
a.
Temperature:
Room ambient +32 F to +98 F
b.
Altitude:
Normal ground atmospheric pressure
c.
Vibration:
None
d.
Humidity:
Room ambient
4.4.3
Test equipment and set-up.  In addition to the items listed in
4,5,3, test equipment is required which provides the following characteristics:
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business