Click here to make tpub.com your Home Page

Page Title: Table I. Preproduction and Periodic Production Test Sequence
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-82530(OS)
Table I. Preproduction and Periodic Production Test Sequence
* Units are expended during functioning.
* * Units are subjected to only one environmental test.
Test only units that have been subjected to environmental tests,
4.3.3 Periodic production sample.  From designated lots (See 6. 2f) of ten
t h o u s a n d (10, 000) or less, a random sample of fifty (50) primers shall be selected,
These sample units shall be subjected to the tests of 4.5. The primers shall be
considered satisfactory if they meet all specification and pertinent draw ing re-
quirements and withstand the tests specified in 4.5. (See Table I.) When a lot
is judged defective, acceptance of all units in the lot shall be withheld and the
contractor shall:
a. Determine the cause of the defect.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business