Click here to make tpub.com your Home Page

Page Title: Toxic products and safety
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-85662(AS)
3.4 First article sample.  When specified, a sample shall be subjected
to first article inspection (see 6.2.3).
3.5 Toxic products and safety.  Safety regulations and guidelines
applicable to the production and use of the propellant shall be complied
with to preclude personal injury and damage to equipment and facilities.
3.6 Manufacturing process.  When specified in the contract or purchase
order (see 6.2.2), the propellant shall be manufactured by a process
approved by the contacting officer, and no deviations from that process
shall be made without his prior approval.
3.7 Workmanship.  The workmanship shall be such that the propellant is
uniform in appearance, consistent in high quality, and free from visible
contamination.
4.
QUALITY ASSURANCE PROVISIONS.
4.1 Responsibility for Inspection.  Unless otherwise specified in the
contract or purchase order (see 6.2.1), the contractor shall be respon-
sible for the performance of all inspection requirements as specified
herein.
Except as otherwise specified, the contractor may utilize his
own facilities or any commercial laboratory acceptable to the Government.
The Government reserves the right to perform any of the inspections set
forth in this specification where such inspections are deemed necessary
to assure that supplies and services conform to prescribed requirements.
4.1.1 Classification of inspection.
The inspection requirements speci-
fied herein are classified as follows:
a.
First article inspection (see 4.1.2).
b.
Quality conformance inspection (see 4.2).
4.1.2 First article inspection.  A first article sample consisting of
a quantity of propellant specified in the contract or purchase order
shall be delivered to the testing activity for first article testing (see
6.2.3).
The first article sample shall be manufactured using the same
methods, materials, processes, and procedures as used in production.  Any
production prior to acceptance of the first article sample is at the risk
of the contractor.  The first article sample shall be taken from the
first production lot and the sample shall be submitted in accordance with
3.4.
Identification shall be in accordnace with MIL-STD-1168.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business