Click here to make tpub.com your Home Page

Page Title: Vibration, operating
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-19046D(OS)
characteristics of this specification after being tested as in 4.4.1.2.
3.4.1.2 Vibration, operating.  The firing relay panel shall show no
damage and shall meet all the performance requirements and product
characteristics of this specification during and after the test specified
in 4.4.1.3.
3.4.1.3 Vibration, transportation.  The firing relay panel shall show
no damage and shall meet all the performance requirements and product
characteristics of this specification after being tested as in 4.4.1.4.
3.4.2 Shock, transportation.  The firing relay panel shall show no
damage and shall meet all the performance requirements and product char-
acteristics of this specification after being tested as in 4.4.2.
3.4.3 Temperature and humidity
3.4.3.1 High temperature and humidity nonoperating. The firing relay
panel shall show no damage and shall meet all the performance requirements
and product characteristics of this specification after being tested as
in 4.4.3.1.
3.4.3.2 High temperature, operating.  The firing relay panel shall be
capable of meeting all the performance requirements of this specification
while undergoing the test specified in 4.4.3.2.
3.4.3.3 Low temperature, nonoperating.  The firing relay panel shall
meet all the performance requirements and product characteristics of this
specification after being tested as in 4.4.3.3.
3.4.3.4 Low temperature, operating.  The firing relay panel shall be
capable of meeting all the performance requirements of this specification
while undergoing the test specified in 4.4.3.4.
3.5 Cleanup.  Prior to and after final assembly, all parts, components,
and the assembly shall be thoroughly cleaned of loose, spattered or ex-
cess solder, metal chips, and other foreign matter.  Burrs and sharp edges,
as well as rosin flash, shall be removed.
3.6 Workmanship. The equipment, including all parts and accessories,
shall be constructed and finished in a manner to ensure compliance with
all requirements of this specification. Particular attention shall be
paid to neatness and thoroughness of soldering, wiring, marking of parts
and assemblies, impregnation of coils, plating, painting, machine screw
assemblage, welding, riveting, brazing, and freedom of parts from all
burrs and sharp edges.  The standards of workmanship exhibited in any
approved preproduction sample, subject to any qualification stated in the
Government's notice of approval, shall be determinative of the require-
ments of the contract relative to workmanship insofar as not specifically
covered by applicable specifications.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business