MIL-R-24159A(SH)
Option
Applicable DID no.
Data requirement title
Paragraph no.
Level 3
DI-E-7031
Drawings, engineering
3.8
Design activity
and associated lists
designation-
contractor
Design activity
drawing
number -
contractor
UDI-T-23790
Report, first article
4.3
test
(Data item descriptions related to this specification, and identified in
section 6 will be approved and listed as such in DoD 5000.19L., VOl. II, AMSDL.
Copies of data item descriptions required by the contractors in connection with
specific acquisition functions should be obtained from the Naval Publications
and Forms Center or as directed by the contracting officer.)
6.2.2.1 The data requirements of 6.2.2 and any task in section 3, 4 or 5
of this specification required to be performed to meet a data requirement may be
waived by the contracting/acquisition activity upon certification by the offeror
that identical data were submitted by the offeror and accepted by the Government
under a previous contract for identical item acquired to this specification-
This does not apply to specific data which may be required for each contract
regardless of whether an identical item has been supplied previously (for example,
test reports).
6.3 First article inspection  Invitations for bids should provide that
the Government reserves the right to waive the requirement for samples for first
article inspection as to those bidders offering a product which has been pre-
viously acquired or tested by the Government, and that bidders offering such
products, who wish to rely on such production or test, must furnish evidence
with the bid that prior Government approval is presently appropriate for the
pending contract.
6.4 Sub-contracted material and parts.  The preparation for delivery
requirements of referenced documents listed in section 2 do not apply when the
material and parts are acquired by the contractor for incorporation into the
equipment and lose their separate identity when the equipment is shipped.
6.5 Changes from previous issue.  Asterisks are not used in this revision
to identify changes with respect to the previous issue, due to the extensiveness
of the changes.
Preparing activity:
Navy - SH
(Project 4240-N776)