Click here to make tpub.com your Home Page

Page Title: Test firing facilities and operating procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-R-45012E
That packages opened for examination shall be repackaged
(f)
b y the contractor at the contractor's expense (see 4.4.2.3).
D i s p o s i t i o n of endurance tested rifles (see 4.5.9.6),
g
(h)  S h i p p i n g instructions for production samples and pilot
pack (see 3.1 and 5.1).
( i )  S e l e c t i o n of applicable levels of preservation, packaging
and packing.
( j )  P a c k a g i n g instructions for repair parts (see 5.3).
(k)  P l a c e of final inspection and acceptance (see "Notes" in
MIL-W-13855).
( l )  List of acceptance inspection equipment to be furnished
t h e contractor and responsibilities for other Government
p r o p e r t y to be furnished the contractor (see 4.4.4.1 and 6.7).
( m )  R e s p o n s i b i l i t i e s for furnishing ammunition (see 4.4.4.2
a n d 4.5.7).
-
( n )  S h i p p i n g instructions for rifles and parts when an inter
plant interchangeability test is required (see 4.4.3.5.2).
( o )  Procedures and methods for demilitarizing and disposing
o f rejected material.
(p)  D i s p o s i t i o n of Government furnished property.
(q)  R e s p o n s i b i l i t y f o r t e s t f i r i n g f a c i l i t i e s a n d o p e r a t i n g
p r o c e d u r e s (see 6.3).
6 . 2 Test firing facilities and operating procedures shall be designed
b y the contractor in conformance with local, state, and federal regulations.
a n d suitable for carrying out prescribed firing tests with safety of oper-
a t i n g and visiting personnel.  C o p i e s of these contractor designs shall
b e forwarded to the contracting officer.  G o v e r n m e n t facilities maybe
v i e w e d upon application to the contracting officer.
6.3 When action by a testing agency is required, work programing
w i l l be effected with the testing agency at the earliest practicable date.
6 . 4 To avoid delay in test firing, the Government representative
should maintain a minimum of two months' supply of ammnition as determined
b y anticipated firing requirements.
6 . 5 Monthly reports of the results of final examination and functioning
f i r i n g ,  targeting  and  accuracy,  reliability  and  interchangeability  tests
shall be made to Commanding General, U.S. Army Weapons Command, Attn: AMSWE-
RES, Rock Island, Illinois 61201 and to Commanding General, U.S. Army
Weapons Command, Attn: AMSWE-QA, Rock Island, Illinois 61201
6 . 6 When warranted, the contract should specify the application of
MIL-Q-9858 or MIL-I-45208, as appropriate} on the Management Control Systems
Summary List, DD Form 1660.
6 . 7 Unless otherwise specified (see 6.1p), the contract should
specify the application of MIL-I-45607 and MIL-C-45662 on the Management
Control Summary List, DD Form 1660.