Click here to make tpub.com your Home Page

Page Title: Table I. Examination schedule.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Quality conformance inspection.
Up
Retrofit Kit, Roller, Mine Clearing: Track-Width, Tank - Mounted
Next
Inspection of packaging.



img
MIL-R-53002(ME)
TABLE I. Examination schedule.
Init.
Qual.
Req.
Prod.
Conf.
Characteristic
Para.
1
2
3
4
MAJOR
X
X
101.
Dimensions are not as specified.
3.1.1
X
X
102.
Parts and components are not complete.
3.1.1
X
X
103.
Safety is not as specified.
3.5
X
X
104.
Workmanship is not as specified.
3.9
X
X
105.
Welding certification is not furnished.
3.9.2.1
X
X
106.
Parts are not as specified.
3.6
X
X
107.
Material is not as specified.
3.4
X
X
108.
Carburization and heat treatment is not as
3.3
specified.
MINOR
3.7
X
X
201. Treatment and finish are not as specified.
3.8
X
X
202. Identification marking is not as specified.
4.5.2 Tests.
4.5.2.1 Test conditions. Unless otherwise specified, conformance tests shall be performed by
the contractor at the contractor's location, witnessed by Government inspectors.
4.5.2.2 Test schedule.
TABLE II. Test schedule.
Init.
Qual.
Test
Req.
Prod.
Conf.
Test
Para.
Para.
1
2
3
4
5
-
X
Production pack
4.7.1.2
3.6
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +