Click here to make tpub.com your Home Page

Page Title: Order of precedence of specifications and standards.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-85320(AS)
2.2
Order of precedence of specifications and standards.
Should a conflict exist between any requirement in this specification
and any requirement in the applicable documents referenced herein,
the
requirements of this specification shall take precedence over the ref-
erenced (applicable) document.
3.
REQUIREMENTS
3.1
First article.
The ejector units furnished under this
specification shall be a product which has been inspected and passed the
first article inspection specified herein (see 4.3).
3.2
Selection of specifications and standards. Specifications
and standards for necessary  commodities  and- services not specified
herein shall be selected in accordance with MIL-STD-143.
3.3
Interchangeability. All parts having the same part
number shall be directly and completely interchangeable with each other
with respect to installation and performance.
3.4
Identification of parts. All parts shall be specified on.
the drawings listed in the data list for the ejector unit being procured,
or in accordance with MIL-STD-130, if not specified on the drawings.
The item identification and part number requirements of MIL-STD-100
shall govern the part number and changes thereto.
3.5
Ejector unit.
3.5.1
Construction.  The construction of the ejector unit shall
be
in
accordance
drawings  listed in the data list for the
ejector unit being procured and as specified herein (see 6.2.1f}.
3.5.2
Performance.  The ejector units shall satisfy all perform-
ance requirements when subjected to the following inspections in the
order specified in Tables I and II.
a.
Ejector Unit Inspection (see 4.6.3)
b.
Functional Test (see 4.6.4)
c.
Arming Mechanism (see 4.6.5)
d.
Electric Fuze Arming (see 4.6.6)
e.
Electrical Characteristics (see 4.6.8a)
f.
Lag
Time
or Time of Release Determination (see
4.6.8b)
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business