Click here to make tpub.com your Home Page

Page Title: Inspection conditions.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-R-85323(AS)
(5F) indicated prior to conducting any tests.
Unless otherwise specified, temperature stabiliza-
tion will have been attained when the indicated
temperature of the-surface of the largest mass of
the test item does not change by more than 2.8C
(5F) in a period of 1 hour.
c.
Swaybraces.  Whenever tests require that a store be
mounted to the bomb rack, swaybraces shall be used.
The swaybraces shall be adjusted as described in
4.6.2.2a.
d.
Test stores.  The stores, as referenced herein by
weight, shall conform to the following parameters.
The store suspension lugs shall be in accordance
with MS3314.
1.
The 22.7 kilogram (50 pound) store shall utilize
applicable suspension lugs spaced 355.6 milli-
meters (14 inches) apart.  Its center of gravity
shall be midway between the suspension lugs and
51 to 152 millimeters (2 to 6 inches) below the
hook bearing surface of the lug.
2.
The 113 kilogram (250 pound) store shall utilize
applicable suspension lugs, spaced 355.6 milli-
meters (14 inches) apart.  Its center of grav-
ity shall be based on the MK 81 L.D.G.P. bomb.
NOTE
Whenever a store is loaded onto any station
of the bomb rack,  the piston of each
loaded ejector  shall be pulled down so
that it contacts the test store.
e.
Test fixtures.  During any test requiring that the
bomb rack be supported, a fixture shall be utilized
which is in accordance with DL1025AS100.  During any
test requiring that an individual ejector unit be
supported, a fixture manufactured in accordance with
Figure  1 shall be used.
The hangar assemblies
(Drawing 292AS101) shall be furnished by the procur-
ing activity (see 6.2.lm).
f.
The  bomb rack shall
Input power requirements.
perform satisfactorily under all applicable condi-
tions specified herein from a 28 VDC rated voltage
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business