|
| MIL-S-1419D (PA)
5.3 Marking. - Marking shall be In accordance with dwgs.
8836949 and 8836950.
NOTES
*6
6.1 Ordering data. -Procurement documents shall specify
the following:
a. Title, number and date of this specification.
b. Data cards. - Data cards shall be prepared for each
lot in accordance with the information specified In Standard
MIL-STD-1167.
c. Provisions for submission of first article samples.
6.2 Inspection code numbers .-The five digit cede numbers
assigned to the inspections herein are to facilitate future
data collection and analysis by the Government. They should
be cited as references on drawings of equipment designs sub-
mitted by the contractor to the Government for approval (see
6.3.3).
6.3 Inspection Equipment Designs .-Inspection equipment
designs are or two types - Government Special Inspection Equip-
ment (SIE) designs and contractor designs. SIE designs are
designated by drawing numbers under the "Method of Inspection"
headings in Section 4. Design responsibility for all other
inspection equipment is assigned to the contractor. The
contractor need not furnish any design when a complete Govern-
ment SIE design is provided. Unless otherwise specified, how-
ever, the contractor may submit alternate or modified con-
tractor designs of SIE in accordance with 6.3.2 and 6.3.3
should he elect to do so.
6.3.1 SIE designs.-SIE designs may consist of any of the
following:
a. Detailed drawings which completely depict all infor-
mation necessary for the fabrication and use of the item of
inspection equipment.
b. A source control drawing or a specification control
drawing as defined In MIL-STD-100.
c. An envelope drawing, as defined In MIL-STD-100,
meet. When envelope drawings are specified the contractor shall
prepare designs which comply with the criteria therein.
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |