Click here to make tpub.com your Home Page

Page Title: Test Schedule for ATS/AD-1 Operating as an Accessory Drive
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-22518 /2(AS)
TEST SCHEDULE FOR ATS/AD-1 OPERATING AS AN ACCESSORY DRIVE
HYDRAULIC
ATS/AD
PAD "B"
PUMP
AMBIENT
DRIVE
DISCHARGE  PUMP
AIR
FLOW
TIME
PRESSURE
TEMPERATURE
ALTITUDE
SPEED
F
(GPM)
CONDITION
(MIN)
(RPM)
(PSI)
(FT)
7.5
2950
200
2980
13
Idle
Sea Level
2980
Sea Level
2950
7.5
0
200
Idle
2950
13
200
4230
Military
2.5
SL to 45,000
2950
200
4230
2.5
Military
0
SL to 45,000
4230
45,000
2950
200
1
18
Military
4230
2950
200
1
6
45,000
Military
2950
200
4230
0
Military
45,000
5
45,000
200
2950
Military
18
4230
1
200
Military
4230
45,000
2950
1
6
200
2950
Military
4230
6
0
45,000
*Normal
45,000
2950
4100
170
1
18
2950
1
4100
45,000
170
6
*Normal
*Normal
170
2950
4100
0
45,000
5
45 to 70,000
Afterburner
2950
200
4260
6
1
Afterburner
4260
2950
200
4
0
45 to 70,000
4260
2950
Afterburner
200
1
6
70,000
2950
Afterburner
200
4
4260
0
70,000
Military
2950
200
4230
18
1
70 to 45,000
200
2950
Military
4230
0
1
70 to 45,000
Military
4230
200
2950
18
1
70 to 45,000
Military
4230
200
0
2950
1
70 to 45,000
2950
Military
200
4230
18
1
70 to 45,000
**Normal
18
170
2950
4230
45,000
1
Normal
170
2950
4230
0
45 to 5000
1
200
Idle
2980
13
1
2950
45 to 5000
200
Idle
2980
0
2950
4
45 to 5000
200
2980
13
Idle
2950
1
45 to 5000
200
Idle
4
2980
2950
45 to 5000
0
5000
200
80%
2950
1
3680
13
200
4
2950
80%
3680
5000
0
200
2950
13
80%
5000
3680
1
200
80%
4
3680
2950
0
5000
200
4230
Military
1
2950
18
5000
225
Military
2950
13
4230
5000
1
2950
Military
4230
225
5000
1
6
4230
Military
225
2950
2
0
5000
80%
200
2950
18
3600
1
5000
200
80%
2950
3600
5000
3
13
200
80%
2950
0
3600
5000
1
Note:
*Repeat for total of four cycles with zero load of last cycle
for 7 minutes.
**Continue this run for 30 minutes with l-minute cycles at 18 GPM
and momentarily back to zero flow between each l-minute loading.
FIGURE 2.
Test schedule for ATS/AD-2.
U.S.
GOVERNMENT
PRINTING
OFFICE
1982-505-022/2141
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business