Click here to make tpub.com your Home Page

Page Title: Packaging
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-3443G (AR)
PACKAGING
5.
Preservation shall be levels A, B or C
5.1 Preservation.
as specified (see 6.2).  Material, methods, processes and pro-
cedures specified shall be in accordance with MIL-P-116.
5.1.1 Level A.
Weapons shall be disassembled as
5.1.1.1 Cleaninq.
necessary to accomplish cleaning.  All metallic surfaces shall be
cleaned by process C-3 and the following special cleaning. Non-
metallic surfaces shall be cleaned by process C-1.
(Burned powder residue)
5.1.1.1.1 Special  cleaning.
Surfaces of components subject to burned powder residue (firing
pin, barrel bore, chamber, etc.) shall be scrubbed clean with
bristle brushes or swabs saturated with rifle bore cleaner MIL-C-
Flush scrubbed surfaces with solvent P-D-680.
372.
All cleaned surfaces shall be thoroughly
5.1.1.2 Drying.
dried prior to preservation application. Drying shall be in
accordance with procedure D-1 except that barrel bore and chamber
shall be dried by procedure D-4 using clean, dry, lint-free
swabs.
application.  All metallic surfaces
5.1.1.3 Preservation
shall be coated with P-9 applied by any process. Excess oil
shall be thoroughly drained from coated surfaces.
5.1.1.4 Unit  pack.  The assembled weapon shall be unit
Insert bore tube (Drawing
packed per method IC-1 of MIL-P-116.
Place weapon into VCI-
7266299) P/N 7267767 into barrel bore.
treated barrier bag in accordance with MIL-B-22020. Place bagged
weapon in the supplementary unit container with the serial number
facing up.  Container shall be in accordance with PPP-B-636,
Place packaged components in container and secure
Grade W5C.
with tape A-A-883.  Use PPP-F-320 or PPP-C-843 to create a tight
Close container and seal all seams and joints with PPP-T-
pack.
76 in accordance with PPP-B-636.
NOTE :  The manual and other components shall be packed as
Non-metallic parts method IC-3 of MIL-P-116.
follows:
Metallic parts IC-1.  Cleaning, drying and preservation
application shall be as previously stated.
Packing shall be level A or B as specified in
5.2 Packinq.
6.2.
33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business