Click here to make tpub.com your Home Page

Page Title: Color standards for stocks may be obtained
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-3443G (AR)
Packaging examination and testing, if different
k.
(see 4.5.4).
Length of barrel if other than 20 (see Table I).
l.
software data base required see 3.2).
m.
Length of chamber if other than 2.75 (see Table
n.
I).
Issue of DODISS to be cited in the solicitation
o.
(see 2.1.1 and 202).
p.  If  the  requirements  of  MIL-I-45208,  MIL-I-45607  or
MIL-STD-45662 are to apply to the acquisition, the procurement
documents should specify such applicability including that the
requirements of MIL-I-45208, MIL-I-45607 or MIL-STD-45662 shall
be applicable only to those inspections and tests (including
associate equipment) required to assure the end items are in
conformance with the technical requirements prescribed. (see 4.1).
q. The following drawings will be required by the
contractor to extablish compatibility of the M7 bayonet with
shotgun  11010009,  11010010,  11010011,  11010066,  11010067,
11010068, 11010069 and 11010076.
Color standards for stocks may be obtained from:
6.3
Commander U.S. Army Armament Research, Development
and Engineering Center (ARDEC) ATTN: SMCAR-QAF-S, Picatinny
Arsenal, NJ 07806-5000.
Inspection equipment
6.4 Inspection  equipment  designs.
designs are of two types - Government Special Inspection
SIE designs are
Equipment (SIE) designs and contractor designs.
designated by drawing numbers under the "Method of Inspection"
heading in Section 4.  Design responsibility for all other
However, the
inspection equipment is assigned to the contractor.
contractor need not furnish any design when a complete Government
SIE design is part of the Technical Data Package (TDP).  Unless
otherwise specified, the contractor may submit alternate or
modified contractor designs of SIE in accordance with 6.4.2 and
6.4.3 should he elect to do so.
35

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business