Click here to make tpub.com your Home Page

Page Title: Contractor designs
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-3443G (AR)
SIE designs may consist of any of the
6.4.1 SIE desiqns.
following:
Detailed drawings which completely depict all
a.
information necessary for the fabrication and use of the item of
inspection equipment.
b.  A source control drawing or a specification
control drawing as defined in DOD-STD-100.
c.  An envelope drawing, as defined in DOD-STD-1OO,
which establishes the criteria which a detailed design shall
meet.  When envelope drawings are specified, the contractor shall
prepare designs which comply with the criteria therein.
6.4.2  Contractor  designs.  Contractor designs are required
for all inspection equipment for which SIE designs are not
specified and may include commercial equipment which the
(Commercial equipment is defined as
contractor proposes to use.
unmodified equipment which is cataloged and available for
Contractor designs shall
purchase m the general public.)
include appropriate operating instructions, calibration
procedures and maintenance procedures.  Commercial equipment
shall be fully described by catalog listing or other means which
provide sufficient information to permit identification and
evaluation by the Government and may include illustrations and
engineering data.  Designs shall be prepared for any special
fixture(s) required to be used with commercial equipment, or with
SIE designs if not otherwise covered thereby (see 6.4.lc).
Designs shall be of the category and form (per DOD-D-1000)
specified in the Contract Data Requirements Lists (DD Form 1423).
The specification number, paragraph number, and defect
number from Section 4 shall be referenced on each contractor
design together with the component of assembly drawing number,
revision letter and date to which the specific design applies.
6.4.3 Submission of designs for approval.  Contractor
designs shall be approved by the Government prior to fabricating
or procuring the equipment.  Designs shall be submitted for
approval in accordance with the stipulations, time frame and
distribution specified in the Contract Data Requirements List (DD
Partial submission of inspection
Form 1423) or in the contract.
equipment designs is permissible and encouraged.  However, the
completion date for design review will be based on the date of
the final submission of designs and the required delivery
The specific segment of
schedule as stipulated in the contract.
36

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business