Click here to make tpub.com your Home Page

Page Title: Table IV. Group C Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-55257C(CR)
TABLE IV Group C Inspection
Reqt
Test
Inspection
Para
Para
4.10
Mounting inserts
3.19
4.11
3.11.4
Solderless-terminal-lug
connections
4.7
Railroad transportation
3.15
3.16
4.8
Drops, flat and rotational
4.5.3.1 Sampling for inspection of solderless-terminal-lug con-
nections.  Five specimens of each combination of wire and terminal pro-
duced each month shall be prepared for inspection.  A specimen is a one
foot length of wire on which a terminal lug has been applied, using the
same tools and procedures used in crimping the terminal lugs in product-
ion.
4.5.3.2 Sampling for other Group C Inspection. For inspection
tests listed below, one unit shall be randomly selected from the first 10
units (or fraction thereof) produced.  Selection of the unit will be made
by the Government.  Since inspection of the mounting inserts needs to be
performed prior to the completion of the unit, unit selected for mounting
insert inspection shall, wherever possible, be different from the unit
selected for other inspections.
Mounting inserts
a.
Tropicalization of material
b.
Interference  suppression
c.
Railroad  transportation
d.
Drops, flat and rotational
e.
4.5.3.3 Order of inspection.
Group C inspection shall be performed
in the order listed in Table IV.
4.5.3.4 Non-compliance.  All quality conformance inspection shall
be halted, including group A & B inspections, upon occurrence of any
group C failure.  The contractor shall immediately report to the Govern-
ment, in writing, each group C failure occurrence, including details of
the failure and characteristics affected.  The contractor shall immedi-
ately investigate the cause of failure and further report the results of
investigation and details of the proposed corrective action on the pro-
cesses and materials, as applicable on all units of production which are
manufactured under the same conditions and which may be subject to the
same failure.  Reports shall be forwarded to the Government Procurement
Quality representative and to the responsible technical activity designa-
ted in the contract.
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business