Click here to make tpub.com your Home Page

Page Title: First article (initial production) approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-60828A(MU)
3.7.17 Interior atmosPhere.- The0 interior atmosphere of Housing
10547482 shall have a dew point of -25 F, or lower, with an atmospheric
pressure of 0.10 to 0.25 psig.
4.
QUALITY ASSURANCE PROVISIONS
i
i
4.1
Responsibility for inspection.- Unless otherwise specified in
the contract or purchase order, the supplier is responsible for the per-
formance of all inspection requirements as specified herein. Except as
otherwise specified, the supplier may utilize his own facilities or any
,:
other facilities-suit~ble for the performance of the inspection require-
ments specified herein, unless disapproved by the Government.  The Govern-
ment reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies
and services conform to prescribed requirements.
.
4.1.1. General provisions.- The component and subassembly inspection
requirements of MIL-O-13830 and MIL-F-13926 form a part of the Quality
Assurance Provisions of this specification. Definitions of inspection
terms shall be as listed in MIL-STD-109.
4.2 First article (initial production) approval.- The requirement
for first article approval and the responsibility (Government or contractor)
for first article testing shall be as specified in the contract. The sample
for-first article approval tests shall consist of three (3) sights plus
q
three (3) each of all items covered by SQAP. The sample shall be manu-
factured in the same manner, using the same materials, equipment, processes,
and procedures as used in regular production.  All parts and materials,
including packaging and packing, shall be obtained from the same source of
supply as used. in regular production.
q
4.2.1 Government testing .- When the Government is responsible for
conducting first article approval tests, the contractor, prior to sub-
mitting the sample to the Government, shall inspect the sample to insure
that it conforms to all the requirements of the contract and submit a
record of this inspection with the sample, including certificates of
conformance for materials.
4.2.2 contractor testing.- When the contractor Is responsible for
conducting first article approval tests, the sample shall be inspected
by the contractor for all the requirements of the contract. The sample
and a record of this inspection, including certificates of conformance
for materials, shall be submitted to the Government for approval. The
Government reserves the right to witness the contractor's inspection.
4.3 "Inspection Provisions.
4.3.1 Submission of product.- Unless otherwise specified by the
contracting -officer, inspection lot size, lot formation and presentation
of lots shall be in accordance with "submission of Product" provisions
of MIL-STD-105
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business