Click here to make tpub.com your Home Page

Page Title: Table V. Location for tests.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-62549(AT)
4.3.3 IPT (first article). To determine conformance to section 3 of this specification in its
entirety and contractual requirements, the Government shall select initial production trailers to be
tested. The trailers shall be representative of production trailers. The trailers will be tested for
6,000 mi to include endurance, performance, reliability, maintainability, design, welding, materials,
and workmanship, as specified in table V. All the tests shall be performed by the Government at a
Government selected test site, utilizing all tables specified herein. The contractor shall have repair
parts prepositioned at the test sites to expeditiously provide for adequate support of the tests at
no cost to the Government.
TABLE V. Location for tests.
Test
Place of
Government
Title of test
Requirement
Paragraph
manufacture
test site
First production
Vehicle inspection
In-process
inspection
4.3.1.1
X
Preliminary
inspection
4.3.1.2.2
X
Vehicle disposition
4.3.1.2.3
X
Shakedown test
4.3.1.2.4
X
IPT (first article)
Section 3
4.3.2
inclusive, 3.1
X
Reliability
3.2, 3.2.3,
3.2.3.1
4.3.2.1
X
Maintainability
3.2.4
4.3.2.2
X
QCI and acceptance
4.4.7
X
Controls tests
4.5
X
Comparison tests
4.6
X
Accept-
ance
Control
Examinations,
inspections, and
tests
4.7
X
X
X
Materials check
3.3, 3.3.1
4.7.1
X
X
Screw threads
check
3.4.3
4.7.2
X
X
X
Lashing rings
check
3.4.17.5
4.7.3
X
X
21

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business