Click here to make tpub.com your Home Page

Page Title: Inspection equipment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-63302(AR)
4.4.3 Testing.  Testing is described in the First Article
and Quality Conformance Inspection Tables.
4.4.3.1 Check test for deterioration of detonators/explosive
leads (listed below).
If the total time between original
acceptance of any lot and the assembly  of  that lot  into the S&A
exceeds two years, or if the detonators or explosive leads have
been subjected to adverse conditions, however brief, at any time
since previous tests, the detonator or explosive lead lot shall
be subjected to and must satisfactorily pass the check test for
deterioration specified in Military Specifications listed below
immediately before they are assembled into the S&A.  This test
shall be performed by the contractor, on detonators or explosive
leads selected by the Government inspector, at the facility
assembling the detonators or explosive leads into the S&A.  The
test shall be conducted at Government expense without cost to
the contractor who assembled the detonators/explosive leads or
the contractor assembling the detonators/explosive leads into the
S&A and shall not constitute a basis for rejection against either
contractor except where deterioration has occurred as a direct
result of carelessness in handling, storage, etc., permitted
while the detonator or explosive lead lot was under the
responsibility of either contractor.  The Contracting Officer
shall arrange to have the contractor reimbursed for the expense
incurred in the performance of check tests.  In the check test
for deterioration of the M100 Detonator, the lead cup functioning
requirement of MIL-D-48120 shall be omitted.
MIL-D-48120 -
Detonator, Electric, M100, Parts
For, And Loading, Assembling And
Packing.
MIL-D-63197 -
Detonator, Delay Electric, PA 506;
Parts For, And Loading, Assembling
And Packing.
MIL-L-63246 -
Lead, Explosive:  PA-509, PA-512,
PA-513, PA-514, PA-516, PA-517;
Parts For, And Loading, Assembling
And Packing.
4.4.4 Inspection equipment.  The inspection equipment
required to peform the examinations and tests prescribed herein
is described in the Paragraph Reference/Inspection Method column
in the forms starting with Paragraph 4.4.2.1.  The contractor
shall submit for approval inspection equipment designs in
accordance with the terms of the contract.  See Section 6 of
MIL-A-48078 and 6.4 herein.
68

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business