MIL-S-63302 (AR)
4.5.12 Detonation velocity of MDF, PBXN-5 lead sheathed -
Dwg. 9328726.  Following examination of 4.5.11.1 the sample from
4.5.10 shall be subjected to a detonation velocity test in
accordance with the procedure specified on the applicable
drawing.  Observation shall be made for compliance with the
requirements of the drawing - Note 3. (Destructive test)
4.5.13 Load test of lower housing assembly - Dwg. 9329813.
The assembly shall be placed in an approved fixture and the
static load applied as specified on the applicable drawing.
Observation shall be made for compliance with the requirements of
the drawing.  Assemblies subjected to this test shall not be
returned to the lot.
4.5.14 Continuity resistance test of flexible cable assembly
after assembly to S&A's. - Dwg's 9328756/9292700.  Following
assembly to appropriate S&A and the drilling of a hole for the
subsequent insertion of an eyelet, the flexible cable assembly
shall be subjected to the resistance test specified on the
applicable S&A drawing.  Readout meter shall be a milliohmmeter
or equivalent with a test current of one milliamps or less.
Observation shall be made for compliance with the requirements of
the applicable S&A drawing.  After resistance measurements, the
electro explosive device(s) shall have their input leads
positively shorted. (Non-destructive test)
4.5.15 Environmental and safety tests of S&A assembly -
Dwg's. 9328756/9292700.
4.5.15.1 Jolt.  After verification of the safe condition of
4.5.19, the test sample of S&A assemblies shall be assembled to
fixtures and shall be tested in accordance with MIL-STD-331, Test
No. 101.2, Procedure II.  Observation shall be made for
compliance with the requirement of 3.4.1. (Destructive test)
4.5.15.2 Jumble.  After verification of the safe condition
of 4.5.19, the test sample of S&A assemblies shall be tested in
accordance with MIL-STD-331, Test No. 102.1.  Observation shall
be made for compliance with the requirements specified in 3.4.2.
(Destructive test)
4.5.15.3 Transportation vibration - Dwg's 9328756/9292700.
After verification of the safe condition of 4.5.19, the S&A
assemblies shall be assembled to fixtures and subjected to Test
119, procedure 2 of MIL-STD-331.  Observation shall be made for
compliance with the applicable requirements specified in 3.4.3.
74

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business