Click here to make tpub.com your Home Page

Page Title: Examination.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-63348A(AR)
4.5.1.1.1 Formation  and  presentation. The formation and
presentation of inspection lots shall be in accordance with
MIL-STD-105.  Lot formation shall be established after final
inspection of submachineguns by the contractor and prior to
conducting tests specified in Table IV.
4.5.1.1.2 Lot size.  Unless otherwise specified herein, an
inspection lot shall consist of 500 weapons or a month's production,
whichever is smaller.  These weapons shall be assembled from lots of
component parts that have met all inspection requirements.
4.5.1.1.3 Lot identification.  Each Inspection lot shall be
identified with a lot number. The serial number of each weapon in a
lot shall be recorded on the individual weapon record. The reason
for rejection of any inspection lot shall be recorded. When a
rejected inspection lot is resubmitted after reconditioning, it
shall be identified as such.
4.5.1.2 Parts and packaging. The formation, size, and
presentation of inspection lots of parts and packaging shall be in
accordance with MIL-STD-105.  Inspection lots shall be as large as
practicable in consideration of quality history, manufacturing
conditions, contractors delivery schedule, and shall be within the
limitations of MIL-W-13855.
4.5.2 Examination.
4.5.2.1 Submachineguns.
Final examination of weapons shall be
performed by the contractor after completion of all testing of Table
III.  Unless otherwise specified herein, each weapon shall be
examined for the classification of defects in 4.5.2.2.3. All
non-conforming weapons shall be rejected and the reason for
rejection recorded.  The place of final examination and acceptance
criteria shall be as specified in the contract (see 6.1).
4.5,2.1.1 Rejected submachineguns. Rejected weapons shall be
corrected by the contractor and  the corrective action taken shall be
recorded.  The weapons shall be reexamined for all defects listed in
the applicable groups in 4.5.2.2.3.
When any of the following
parts are replaced to correct a non-conforming weapon, the weapon
shall be retested as indicated by asterisks:
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business