Click here to make tpub.com your Home Page

Page Title: Classification of inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-70437 (AR)
3.2 First article inspection.  This specification contains
provisions for first article inspection.  Requirements for the
submission of first article sample of the contractor shall be as
specified in the co ntract.
3.3 Functioning.
3.3.1 Sensitivity and output.  The spitback lead assembly
when initiated by a high order detonator output will function high
order and will indent the steel witness block to a depth of not
less than 0.025 inches when tested as specified in 4.5.2.1.
The spitback lead assembly when
3.3.2  Varicomp initiation.
initiated by a higher order detonator output will function high
order and cause a 21.49% Varicomp explosive (NOL PR 6391 mix
X-N0385) at 1.92 inch minimum air gap to function high order and
indent a steel witness block to a depth of not less than 0.015
inch when tested as specified in 4.5.2.2
3.4 Workmanship.  All parts and assemblies shall be
fabricated finished in thorough, workmanlike manner.  All
parts and assemblies shall be clean and free of burrs, sharp
edges, unblended radii, surface defects, chips, dirt, grease and
oil, corrosion products and other foreign matter.  The cleaning
method used shall not be injurious to any part or assembly, nor
shall they be contaminated by the cleaning agent.  All required
markings and stampings (for packing) shall be neat and sharply
defined.  Required packing materiels shall be dry.
QUALITY ASSURANCE PROVISIONS
4.
4.1 Responsibility for inspection and standard quality
assurance provisions.  Unless otherwise specified herein or in the
contract, the provisions of MIL-A-48078 shall apply and are hereby
made a part of this detail specification.
4.2 Classification of inspection.  The following types of
inspection shall be conducted on this item:
First Article Inspection
Quality Conformance Inspection
b.
4.3 First article inspection.
4.3.1 Submission.  The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with the provisions of 4.3.2 and 4.3.3.
The first article sample shall consist of the following items in
sample quantities as indicated.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business