Click here to make tpub.com your Home Page

Page Title: Inspection equipment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-70682
4.4.3 Testing.
Testing is described in the First Article table
and Quality Conformance Inspection.
4.4.3.1
Moisture content (see Table II) - major defects
TABLE II
Charge composition
(see 3.3.1)
Paper and paper products
(see 3.3.2)
The contractor shall provide adequate controls to insure that the
materials comply with the requirements.  For verification, the
contractor shall selects and subject to test, one sample of each
material from each eight (8) hours production.  If a composite
sample exceeds the requirement, that quantity or sub-lot material
represented by the sample shall not be used in loading and packing,
the remaining unloaded and unpacked material shall not be used in
production, and the loaded and packed simulators shall be rejected.
Test shall be performed as specified in 4.5.2.
4.4.4  Inspection equipment.  The inspection equipment required
to perform the examinations and tests prescribed herein is described
in the Paragraph Reference/Inspection Method column in the tables
starting with paragraph 4.4.2.1.  The contractor shall submit for
approval inspection equipment designs in accordance with the terms
of the contract.  See Section 6 of MIL-A-48078 and 6.3 herein.
4.4.5 Functioning test.
4.4.5.1 Hot and ambient temperature.  Beginning with the first
lot produced and continuing until three (3) consecutive lots have
complied with the acceptance criteria of 4.4.2.21, fifty (50)
simulator assemblies shall be selected from each lot for test.
After three (3) consecutive lots have met the acceptance criteria of
4.4.2.21, thirty-two(32) simulators shall be selected from each lot
for this test. The lot shall be rejected in one (1) or more major
functioning defects occur, and lot sampling shall revert to fifty
(50) samples per lot in accordance with 4.4.2.21.
4.4.5.2 Cold temperature.  beginning with the first lot
produced and continuing until three (3) consecutive lots have
complied with the acceptance criteria of 4.4.2.21 fifty (50)
simulator assemblies shall be selected from each lot for test.
After three (3) consecutive lots have met the acceptance criteria of
4.4.2.21, thirty-two (32) simulators shall be selected from each lot
for this test.  The lot shall be rejected if two (2) or more major
functioning defects occur, and lot sampling shall revert to fifty
(50) samples per lot in accordance with 4.4.2.21.
37

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business