Click here to make tpub.com your Home Page

Page Title: Electrical Power Utilization
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-18232B(AS)
3.12.2.2
SUMMARY OF ACTUATED ITEMS. - Items operated pneumatically
shall be as required by the detail specification.
3.13
ELECTRICAL
3.13.1
DESCRIPTION. - The electrical system includes all components
required for generation, storage, conversion, distribution,
and control of electric power~
3.13.2
ELECTRICAL POWER SUPPLY. - An electrical prime-power system
shall be provided subject to NAVAIR approval. The selection
of equipment shall be based on an acceptable preliminary load analysis conforming
to MIL-E-7016.
3.13.3
ELECTRIC POWER CONVERSION SYSTEM. - An electric power con-
version system shall be subject to NAVAIR approval. The
selection of equipment shall be based on acceptable preliminary load analysis
conforming to MIL-E-7016.
ELECTRICAL POWER UTILIZATION. - The electric input power to
3.13.4
utilization equipment shall be in accordance with MIL-STD-704.
The power demand characteristics of utilization equipment shall be within the
limits prescribed by MIL-STD-704.
3.13.5
EQUIPMENT INSTALLATION. - The installation of electrical
equipment shall be in accordance with Specification MIL-E-25366.
In general circuit breakers or fuses shall not be used. However, protection may
be employed for certain circuits and for clearing temporary faults, provided
operation and protection does not result in abortion of the mission.
3.13.6
WIRING. - Electrical wiring shall be provided in accordance
with Specification MIL-w-8L60 except that routing and grouping
of cables need only be made in such a manner as to facilitate manufacture of the
target without compromising reliability.
3.13.7
BONDING. - Bonding shall be in accordance with Specification
MIL-B-5087.
3.13.8
IGNITION AND STARTING SYSTEM
3.13.8.1
RECIPROCATING-ENGINE TARGET. - The ignition and starting sys-
tem shall be provided in accordance with applicable specific-
ations.
3.13.8.2
TURBO-ENGINE TARGET. - The ignition and starting system shall
be provided as required by the detail specification.
3.13.9
GROUND SERVICING RECEPTACLE. - A receptacle shall be provided
for ground checking and warm-up of all electrical and electronic
equipment by external power and control prior to launching the target.
41

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business