Click here to make tpub.com your Home Page

Page Title: Figure 1.First article or periodic production tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
1. When the purchase document specifies Level C packaging and packing. this test is not required; other - preceding
the vibration, transportation, handling and storage tests are required only for the first article sample.
2 Prior to performing the vibration. transportation. handling and storage test, insulation resistances shall be measured
wthout removing the panel-chassis assembly from the case. Contacts to GND listed by tables V and VI shall be made
to pin B of the TEST STAND connector. The following insulation resistances cannot be measured at this time:
Wiper REL-X4 to Ground
a.
Wiper REL-XS to Ground
b.
c.
Moving Contact REL-IC to Ground
d.
Moving Contact REL-ID to Ground
3 All insulation resistance shall be measured after vibration, transportation, handling and storage.
FIGURE 1. First article or periodic production testS-
11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business