Click here to make tpub.com your Home Page

Page Title: Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-45379D(AT)
DRAWINGS
ARMY
8750019
- Tank Combat, Full-Tracked 105 MM Gun,
M60A3 with Tank Thermal Sight.
(Copies of specifications, standards, handbooks, drawings, publications, and other
Government documents required by the contractors in connection with specific acquisition
functions should be obtained from the contracting activity or as directed by the contracting
activity.)
2.2 Order of precedence. In the event of a conflict between the text of this specification and
the references cited herein (except for associated detail specifications, specification sheets or
MS standards), the text of this specification shall take precedence. Nothing in this specification,
however, shall supersede applicable laws and regulations unless a specific exemption has been
obtained.
3. REQUIREMENTS
3.1 First article.
3.1.1 Preproduction model. When specified (see 6.2), a preproduction model(s) of the
complete vehicle to be furnished under this specification shall be produced prior to the
manufacture or fabrication of vehicles in quantity. The vehicle(s) when completed shall be
submitted to the Government for inspections to determine conformance to the requirements of
this specification. Vehicle(s) submitted by the contractor shall be fully representative of vehicles
proposed to be supplied by the vehicle manufacturer from production facilities and tooling under
the supply contract.
3.1.2 Initial production vehicle. An initial production vehicle, which shall be fully
representative of vehicles proposed to be furnished under the contract, shall be submitted to the
Government for inspection to determine conformance to the requirements of this specification.
3.2 Materials. The contractor shall be responsible for ascertaining that all assemblies and
component parts that go into the construction of this vehicle, which require product qualification
in accordance with a specification, are listed on respective qualified products lists (QPL) or
have been approved for inclusion on such lists. Inspection records shall specifically list such
components, name of supplier(s), and number and date of applicable QPL (see 4.6.1 and 6.6).
3.3 Design and construction. Vehicles, components, subassemblies, and assemblies shall be
fabricated and assembled into a complete vehicle in accordance with drawings listed or referred
to on Drawing 8750019. All parts requiring identification shall be marked in accordance with
MIL-STD-130 (see 4.6.2).
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business