Click here to make tpub.com your Home Page

Page Title: Functional
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-46591B
numbers shall be in consecutive order beginning with the number 001 in each production lot. Any missing
numbers are to be identified on the X-rays. The thrusters shall be arranged on trays or boards in consecutive
numerical order, and each radiograph shall carry a permanent identification of the units displayed thereon.
The radiographic plate identification shall include item nomenclature, the complete lot number, the span of
serial numbers displayed, and the contract number. The radiographs of the entire production lot shall
accompany the ballistic sample to the activity conducting the production lot acceptance test. Defective
thrusters found during X-ray review are to be marked on the X-ray prior to shipment and those defective items
shall be removed from the production lot. Film interpretation of the radiographs shall verify the presence and
correct positioning of the following parts:
a.
Cartridge, Impulse M94, P/N 8596708
b.
Setscrew, P/N MS51029-111
c.
Pin, Shear, P/N 8593876
d.
Pin, Firing, P/N 8593878
e.
O-ring, P/N AN6227-B7
f.
Firing Pin Housing Assembly, P/N 10520880
g.
O-rings (two), P/N MS29513-122
h.
Piston, Gas, P/N 10520887
i.
O-ring, P/N AN6227-B13
j.
Pin, Unlock, Shear, P/N 10520882
k.
O-ring, P/N AN6227-B20
l.
O-ring, P/N AN6227-B13
m.
Ring Nut Assembly, P/N 10520881
n.
Ring Retaining, P/N 10520883
o.
Spacer, Piston, P/N 10520888
p.
Retainer (four), P/N MS35803-115
q.
Reservoir Assembly, P/N 10520890
r.
Piston Rod Assembly, P/N 10520885
s.
Body, P/N 10520889
t.
Rod, End, P/N 10520884
u.
Gasket, P/N 10520878
v.
Plug, P/N 10520879
w.
Screw, Hollow Lock, P/N 10520900
x.
O-ring, P/N AN6227-B6
y.
Spacer, Reservoir, P/N 10520886
4.3.4 Functional.
4.3.4.1 Ballistics. The test sample shall be rigidly supported so that the entire thrust is borne by the
thruster mounting points. The samples shall be tested within 10 minutes after removal from the temperature
conditioning chamber. When this time limit is exceeded, the sample units shall be reconditioned at the
original temperatures.
4.3.4.2 Temperature conditioning. Each assembled thruster shall be conditioned for not less than 4
hours nor greater than 24 hours. When reconditioning thrusters at 65F, all condensation shall be removed
from the exterior surfaces before returning the thruster to the conditioning chamber.
9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business