Click here to make tpub.com your Home Page

Page Title: Corrections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-46780D(AT)
4.1.5.3.1 Corrections. Corrections found necessary as a result of above inspection shall
be made by the contractor on the vehicle.
4.1.5.3.2 Vehicle disposition. Upon completion of inspection and acceptance of the first
production vehicle of each model, these vehicles shall remain at the manufacturing facility as
production samples. These vehicles may be released for shipment after 120 days from start of
production or when the production run of the particular model has been completed prior to the
120 day time limitation. If the quality level of the subsequent produced vehicles exceeds the
acceptance standard, the first production vehicle may be released sooner at the discretion
of the Purchasing Contracting Officer. The contractor shall service and maintain the vehicle(s)
during this period in accordance with the application documents for care and preservation while
in storage. If the quality level of the subsequent produced vehicles exceeds the acceptance
standard, the first production vehicle may be released sooner at the discretion of the Contracting
Officer. The contractor shall service and maintain the vehicles during this period in accordance
with the applicable documents for care and preservation while in storage.
4.1.5.4 First production vehicle test. After inspection, and acceptance of the first
production vehicle two of each model (or less, as may be prescribed by the Procuring
Contracting officer) from the immediate production following, shall be selected by the
Government and, after inspection by contractor shall be subjected to examinations and tests for
conformance to this specification and Tables VI, VII, and VIII as applicable to the model
vehicle. The tests will require a maximum of 90 days at a Government test site. The contractor
shall support the tests by providing replacement parts necessary for completion of tests. Delay in
test completion caused by the vehicle breakdown or failure of the contractor to adequately
support the vehicle with parts during the tests shall not be the basis for adjustments of the
contract delivery schedule or contract price.
Table VI. 20,000 mile test for all models,
except Van models and Truck Tractors
Course
Mileage & speeds
Vehicle loading
Hard surface
8000 miles at varying speed up
Highway payload
to maximum
(see Table XIV)
Secondary
5850 miles at speeds applicable
Highway payload
(see Table XIV)
to conditions of terrain
Level and hilly
6000 miles at speeds applicable
Limited cross and
Country
to conditions of terrain
Cross-country
(see Table XIV)
Cross-country
Belgian block
150 miles at speeds applicable
to conditions of terrain
(see Table XIV)
24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business