Click here to make tpub.com your Home Page

Page Title: First article (initial production) approval
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-48578(MU)
4.2 First article (initial production) approval. - The requirement
for first article approval and the responsibility (Government-or con-
tractor) for first article testing shall be as specified in the contract.
The sample for first article approval tests shall consist of three Artillery
trainers and three each of all items covered by SQAP. The sample shall
be manufactured in the same manner, using the same materials, equipment,
processes, and procedures as used in regular production. All parts and
materials, including packaging and packing, shall be obtained from the
same source of supply as used in regular production. The first article
sample of three each of all items covered by SQAP shall be tested to
their respective SQAP requirements. The first article sample of three
Artillery trainers shall be subjected to the requirements and tests in
Tables I, II, III, IV and the following:
REQUIREMENT
TEST PROCEDURE
CHARACTERISTIC
Reliability
4.4.3
3.4
Vibration "B"
4.6.6
3.5.2.3
4.6.8
Sunshine
3.5.2.5
Rain
4.6.9
3.5.2.6
4.2.1 Government testing. - When the Government is responsible for
conducting first article approval tests, the contractor, prior to submitting
the sample to the Government, shall inspect the sample to insure that it
conforms to all the requirements of the contract and submit a record of
this inspection with the sample, including certificates of conformance for
materials.
4.2.2 Contractor testing. - When the contractor is responsible for
conducting first article approval tests, the sample shall be inspected
by the contractor for all the requirements of the contract. The sample
and a record of this inspection, including certificates of conformance
for materials, shall be submitted to the Government for approval. The
Government reserves the right to witness the contractor's inspection.
4.3 Inspection provisions.
4.3.1 Submission of product. - Unless otherwise specified by the
Contracting Officer, inspection lot size, lot formation and presentation
of lots shall be in accordance with "Submission of Product" provisions
of MIL-STD-105.
4.3.2 Examination and tests.
4.3.2.1 Components and subassemblies. - All components and subassemblies
shall be inspected in accordance with the inspection provisions contained
in Supplementary Quality Assurance Provisions (SQAP) listed in the
technical data package (TDP). In the absence of SQAP's the applicable
Quality Assurance Provisions of MIL-F-13926 shall apply.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business