Click here to make tpub.com your Home Page

Page Title: Responsibility for inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-52843C
Fuel Supply Pressure.
Starter Motor Voltage.
Fuel Return Pressure.
Starter Current First Peak.
Fuel Filter Pressure Drop.
Internal Battery Resistance.
Fuel Solenoid Voltage.
Battery Resistance Change.
Engine Oil Pressure.
Alt/Gen Output Voltage.
Engine Oil Filter Pressure Drop.
Alt/Gen Field Voltage.
Engine Coolant Temperature.
Alt/Gen Neg Cable Voltage Drop.
Starter Solenoid Voltage.
Starter Circuit Resistance.
Starter Current (Average).
Transmission Oil Pressure.
Test points which are inaccessible for measurement in the TK mode
(see 3.7) shall be made in the DCA mode. A separate wiring harness
shall be provided for the DCA assembly and include all wiring and
necessary hardware to perform required capabilities. The contractor
shall also provide vehicle test cards in the format identified on
TACOM drawing No. 12258955 addressing both DCA and TK measurements
and shall incorporate the test cards into forklift technical manuals.
Adaptors required for the interface with the STE/ICE when measuring
in the TK mode shall be permanently installed on the forklift.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection  Unless otherwise specified in
.
the contract, the contractor is responsible for the performance of
all inspection requirements specified herein. Except as otherwise
specified in the contract, the contractor may use his own or any
other facilities suitable for the perfor ance of the inspection
m
requirements specified herein, unless disapproved by the Government.
The Government reserves the right to perform any of the inspections
set forth in the specification where such inspections are deemed
necessary to assure supplies and services conform to prescribed
requirements.
4.1.1 Component and material inspection The contractor is
.
responsible for insuring that components and materials used are
manufactured, examined, and tested in accordance with the
requirements of referenced specifications and standards.
4.2 Classification of inspections  The inspection requirements
.
specified herein are classified as follows:
a.
First article inspection (see 4.3 and 4.4).
b.
Quality conformance inspection (see 4.5).
c.
Inspection comparison (see 4.7).
d.
Inspection of packaging (see 4.8).
4.3 First article inspection. Prior to examination and test of the
forklift specified in 4.3.1.1 and 4.3.2, the following shall be
performed:
45

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business