Click here to make tpub.com your Home Page

Page Title: Government-loaned equipment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-52953C
a.
Title, number, and date of the specification.
b.
Issue of DODISS to be cited in the solicitation, and if required,
the specific issue of individual documents referenced (see 2.1.1).
c.
When first article test is not required (see 3.1.1).
d.
When rail impact test is required (see 3.4).
e.
When other than type E truck is required (see 3.2) .
f.
When solid fill puncture proof tires are required (see 3.14).
g.
When slinging and tiedown eyes are not required (see 3.4).
h.
When batteries shall be shipped other than wet and charged (see
3.19).
i.
When sideshift is not required (see 3.22).
j.
When final color is other than manufacture's color (see 3.25).
k.
When final color shall be 13538 of FED-STD- 595, (see 3.25).
l.
When CARC is required (see 3.25).
m.
When NBC protection is required (see 3.28).
n.
When EMP testing is required (see 3.28).
o.
When information and drawings are required for EMP testing (see
3.27).
p.
When truck is required for EMP evaluation and testing (see 3.27).
q.
When other than SB type battery connector is required (see
3.19.2).
r.
Number of forklifts required for first article test and evaluation
(see 4.3).
s.
Level of preservation and packing required (see 5.1 and 5.2).
t.
When electromag netic interference is required (see 3.32).
6.3  First article.  When a first article inspection is required, the item
shall be a first produced forklift.  The first article should consist of 1 or
more units (see 6.2).  The contracting officer should include specified
instructions in acquisition documents regarding arrangements for examinations,
tests, and approval of the first article test results and disposition of the
first article report.
6.4  Government-loaned equipment .  The contracting officer should arrange
to loan the equipment specified in 3.28.
6.5  Transportability report .  When specified (see 6.2), the contracting
officer should arrange for the contractor to furnish a transportability report
in accordance with AR 70-47 and S.O.P 70-38 for the trucks, 95 days prior to
delivery of the first article truck.
6.6
Subject terms (key word) listing .
Battery powered
Depot type forklift truck
Fork lift truck
Industrial forklift
Material handling equipment
6.7  Change from previous issue .  Marginal notations are not used in this
revision to identify changes with respect to the previous issue due to the
extensiveness of the changes.
23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business