Click here to make tpub.com your Home Page

Page Title: Other Government documents, drawings, and publications
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-T-60697A
2.1.2 Other Government documents, drawings, and publications. The following Government
drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues
are those cited in the solicitation (see 6.2).
DRAWINGS
Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203)
10522631
Thruster, Cartridge Actuated, M3A3, Metal Parts Assembly
8796719
Box, Fiberboard (Inner), Packing, Ammunition, For Thruster, Cartridge Actuated,
M3A3
8797270
Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M3A3
9217573
Box, Fiberboard (Outer), Alternative, Packing Ammunition, for Thruster, Cartridge
Actuated, M3A3
U.S. Air Force
TPO 00-953-5567
Thruster, Cartridge Actuated, M3A3
(Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare
Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.)
2.2 Order of precedence. In the event of a conflict between the text of this document and the references
cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes
applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Materials. All materials used in the manufacture of the thrusters shall conform to the specifications
referred to on the respective drawings unless specific approval in writing covering a departure therefrom has
been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or
methods of manufacture are specified on the drawings, the bidder's selections shall be clearly stated in the
proposal. The remanufactured thruster metal parts assembly shall contain a new shear pin, new O-rings, and
a new piston locking spring.
3.2 Hydrostatic pressure. The body and end cap shall withstand a hydrostatic pressure of 8,000 pounds
per square inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical failure (see 6.3.1).
3.3 Structural strength. The assembled thruster shall withstand a static tensile force of 800 pounds,
minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechanical
failure (see 6.3.1).
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business