MIL-T-62299B(AT)
*
Procurement documents should specify the
6.2 Ordering data.
following:
Title, number, and date of this specification.
(a)
Identification of appropriate service for painting and
(b)
marking (see 3.1.1.1).
(c)
Special exterior markings, if required (see 3.1.1.2).
(d)
Rustproofing, if required (see 3.1.1.3).
(e)
Tropical rustproofing, if required (see 3.1.1.3).
(f)
Power plant heaters and fuel warmer, if required (see
3.4.1.6).
If a battery heater is not required (see 3.4.1.6).
(g)
(h)
Alternator capacity, if other than as specified (see
3.4.2.1).
(i)
Automatic transmission, if required (see 3.4.5.2).
Two-speed axle, if required (see 3.4.9.1).
(j)
(k)
Traction control, if required (see 3.4.9.2).
Disc type wheels, if required (see 3.4.10).
(1)
Bias ply tires, if required (see 3.4.10.1).
(m)
(n)
If a spare tire carrier is not required (see 3.4.10.3).
Spare wheel or rim, if required (see 3.4.10.4).
(o)
Spare tire assembly, if required (see 3.4.10.5).
(P)
A desiccant type air dryer, if required (see 3.4.11.l(k)).
(q)
Tools , if required (see 3.4.16.1).
(r)
Air operated horn, if required (see 3.4.22).
(s)
Automatic speed control, if required (see 3.4.23).
(t)
(u)
If exterior floodlights are not required (see 3.5.5.4).
(v)
Additional electric heaters, if required (see 3.5.7).
(w)
External water supply capability, if required (see 3.5.8).
(x)
Water heater, if required (see 3.5.8).
Fresh water and waste equipment, if required (see 3.5.8).
(Y)
(z)
Additional equipment, if required (see 3.5.9.5).
6.3  Performance prediction.  Completed copies of SAE Truck Ability
Prediction Procedure form and computation for low speed requirement for
each vehicle model furnished under contract should be submitted as
specified in the contract.  Unless other conditions are cited in the
contract, computations should be made for normal atmospheric pressure,
normal ambient air temperature, and still, dry, air.  The factors to be
used in predicting truck ability (see 3.3.1.1) are established as
follows for the corresponding SAE J688, Truck Ability Prediction
Procedure Tables:
Tire Factor.  This factor must relate to
Table 1
the size of tires furnished by the
contractor in accordance with this
specification.
40