Page Title: Wrecker lift-tow load capacity verification
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-62491C
when applicable, 3.5.12. When the tests are completed, the entire unit shall be inspected for
evidence of cracks or deformation. With the boom in the lift-tow position, the hooks shall be
attached to a weight or fixture so that when the winch is engaged the front of the wrecker will lift
off the ground. Following this test the wrecker and chassis shall be examined for evidence of
cracks or distortion.
4.3.4 Winch capacity verification. The contractor shall certify test results showing
compliance with the winch capacity specified in table X or table XIII, with the safety factor
specified in 3.5.5 or 3.6.6.
4.3.5 Wrecker lift-tow load capacity verification. The contractor shall perform calculations
verifying conformance to the lift-tow load in accordance with 3.5.11 or 3.6.11. The front axle
curb weight (load imposed at the ground by the front axle of the vehicle) that is used in the
calculations shall be verified by weighing in the presence of the Government representatives.
*  4.3.6 Rear axle weight. The wrecker, loaded to its most severe lift-tow load configuration in
accordance with tables X, XII or XIII, as applicable, shall have the load on the rear axles
weighed. The weight measured shall not exceed the rear GAWR.
4.3.7 Production sample. Upon acceptance of the first production vehicle, it shall remain at
the manufacturing facility as a production sample, and shall be the last vehicle shipped on the
contract. The contractor shall maintain the vehicle in an as new condition for the duration of the
contract.
4.3.8 Failure. Failure of the first production vehicle to meet requirements of the contract
shall be cause for the Government to refuse acceptance of all vehicles under contract until
corrective action has been taken.
4.4 Inspection of production vehicles. The contractor's inspection system shall as a minimum
assure that the vehicle conforms to the physical and dimensional requirements and is capable of
meeting performance requirements contained herein. For each vehicle under contract, the
contractor shall make available to the Government, at the point of final acceptance, records
acceptable to the Government indicating that the servicing and adjusting required by 3.4.28 have
been accomplished.
4.5 Acceptance inspection. Each completed production vehicle shall be operated for a
distance of not less than 8 km (5 miles) at speeds up to and including 80 km/h (50 mph). During
the acceptance test the vehicle shall be observed for handling characteristics consistent with safe
operating conditions. Following the 8 km (5 mile) road test the boom on type I shall be raised to
at least 45 degrees, lowered, fully extended and retracted to the normal travel position without
45

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business