Click here to make tpub.com your Home Page

Page Title: Inspection methods and procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Inspection records
Up
Turret Subsystem,Universal (UTS), For Armament Subsystem, Helicopter, 20 MM: M197E1 and M97E2
Next
Turret Control Assembly



img
MIL-T-63534(AR)
4.6 Inspection methods and procedures. Any unit which fails to comply
with the specified requirements or evidences degradation of its operational
performance shall be classed defective. Test equipment and procedures shall
be satisfactory to the Contracting Officer (see 4.5.6).
4.6.1 Inspection conditions. Unless otherwise specified in the contract
or purchase order, the requirements for the turret control unit, Drawing
11830908, shall be verified using the following test conditions:
a. Power as specified in the requirenmt of power supply.
b. Temperature of 70F 20F.
Measurements will be made using approved functional inspection
and/or standard commercial measuring equipment (see 4.5.6).
24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +