Click here to make tpub.com your Home Page

Page Title: Table-Rack, Radar Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-81527B(As)
simulated aircraft controls and equipment test bench harnesses; equipment
support and handling fixtures; test equipment both special and standard;
special tools; cooling equipment; and a hydraulic power supply.
3. 3.3 Form Factor.
The AWG-10 Side Bench Missile Control System
Test Set shall be designed for installation in a van as described in
MIL-S-52059B, as well as ship and shore avionics shop layouts. Guidance
Plan CVA61 Avionics Shop No. 1, Main Deck, FRS 29-39, Drawing 610415,
Bench Space 119 through 126 shall be used as a guide to shop layout and
bench design.
3.4 Detail Requirements.
3.4.1 Table-Rack, Radar Maintenance.
The Radar Maintenance Table -Rack shall be for shop
3.4.1. 1 Function.
use and shall provide monitoring, mounting, inter connection, hydraulic
power and cooling facilities for the active Line Replaceable Units of the
The equipment shall electrically simulate MCS
MCS mounted on the bench.
required air craft flight functions and shall enable fault is elation, adjust-
ment, and repair or replacement of defective pallets, circuits, plug in as-
semblies, and components of the MCS.
The Table -Rack shall be compatible with the space
3.4.1.2 Form Factor.
requirements of Type II Shelters (Aircraft Maintenance) per MIL-A-81030
and shall require a space of 18-1/2 feet by 7-1/2 feet with 6-1/2 feet height.
The operating and maintenance area will be 21- 1/2 feet by 10 feet. The total
weight of the equipment, including cables, shall not exceed 4, 200 pounds.
3.4.1.3 Mean Time Between Failures (MTBF). When maintained in
accordance with applicable preventive maintenance procedures, the equip-
ment shall demonstrate at least 400 hours MTBF. Accept-reject criteria
shall be defined by paragraph 4. 2.8.1 of MIL-STD-781.
3.4.1.4 Service Conditions,  The Equipment shall operate satisfactorily
under any of the environmental service conditions or reasonable combina-
tion of these conditions as specified in MIL-H- 15362 except that the panels
of the Test and Control Rack shall comply with MIL-T-21200, Class 3.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business