Click here to make tpub.com your Home Page

Page Title: Preparation for Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-81778C(AS)
Applicable
In-process Inspection.
.2.3
Applicable.
In-process data.
.2.4
Table V shall apply.
Applicable.
Acceptance test plan.
.2.5
Applicable.
Test results.
.2.6
Applicable.
.2,7
Acceptance.
Applicable.
Utilities.
.2.8
Applicable.
.2.9
Configuration.
.3 Tests.
Applicable.
. 3.1 Electrical and electronic items - operational run-in test.
Applicable.
.3.2 Mechanical items.
Applicable.
.4 Environmental test conditions.
.5 Test location,
Applicable.
.6 Acceptance schedule.
Applicable.
. 7 Test procedures.
Applicable.
Applicable.
.8 Rejection and retest.
PREPARATION FOR DELIVERY
.
. 1 General.
Applicable.
.
NOTES
. 1 Intended use.  The LFTS is intended for intermediate level use to
ctionally test, fault isolate, and verify the serviceability of certain
pon replaceable assemblies (WRAs) of the infrared,* missile auxiliary,
ar, and power supply subsystems of Weapon Control System (WCS) AN/AWG-9.
.2
Ordering data.
Applicable,
Definitions.
.3
Applicable.
.4  Nomenclature cross reference.  The following is a cross reference
ween the official Navy nomenclature and the major contractor part numbers.
contractor part number suffix is controlled by the configuration list
the contract.
IR WRAs are tested on OJ-215( )/AWM-23(V) only.
-23-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business