Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
Power supply, dc. A dc power supply, Lambda LB-706-FM-3632, or
3.6.2.7
equivalent,  shall be' supplied and shall provide the capability to supply 200
Vdc at 10 amperes to the dc-dc converter panel of Power Supply PP-6849()/AWM-
23(V).
3.6.3
Elapsed time meter.  An elapsed time meter conforming to MIL-M-7793
shall be provided.  The meter shall be readily visible during operation of the
C&D TS and shall be capable of registering at least 9,999 hours.
4.
QUALITY ASSURANCE PROVISIONS
Applicable.
Responsibility for inspection.
4.1
Applicable.
4.2
General.
Classification.
Applicable.
4.2.1
Individual items.
Applicable.
4.2.2
In-process inspection.
Applicable.
4.2.3
In-process data.
Applicable.
4.2.4
Table V shall apply.
Applicable.
4.2,5
Acceptance test plan.
Applicable.
Test results.
4.2.6
Applicable.
4.2,7
Acceptance.
Applicable.
4.2.8
Utilities.
Applicable.
Configuration.
4.2.9
4.3
Tests.
Electrical and electronic items - operational run-in test.
4.3.1
Applicable.
Applicable.
Mechanical items.
4.3.2
Applicable.
4.4
Environmental test conditions.
Test locations. Applicable.
4.5
"Applicable.
4.6
Acceptance schedule.
Test procedures.
Applicable.
4.7
Applicable.
4.8
Rejection and retest.
-16-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business