MlLT81821
3.3.3.12 Fluid/gaseous transmission lines. All fluid/gaseous transmission lines and tubing
shall be marked in accordance with MILSTD1247 with standard decals to indicate direction of
flow, and shall bear the appropriate color code tape.
The electrical power required to operate each trainer,
3.3.3.13 Electrical requirements.
independently operable trainer panel, panel group and related trainer powered support equipment
under specific load conditions shall be permanently marked on a plate similar to the manufacturer's
data plate. The plate shall be permanently attached adjacent to the master keyed lock switch and
shall indicate the following as applicable:
Power Requirements
Amperage
Voltage
Frequency
Phase
Standby
Operate
Start
*
*
*
28V
DC
*
*
*
120V
60 Hz
*
*
*
120V
400 Hz
Single
Three
400 Hz
120/208V
*
*
A
*
*
B
*
*
c
*
Applicable data shall be entered.
Where the
3.3.3.14 Mounting of identification plates for sectionalized components.
manufacturer's identification plate has been removed due to the sectionalization requirements, the
plate shalI be attached to that portion of the item that is mounted on the trainer, if possible.
Otherwise, the identification plate shall be attached to the component mounting plate.
A warning plate indicating "WARNING PLACE
3.3.3.15 Power switch warning plates.
MASTER KEYED LOCK SWITCH IN OFF POSITION BEFORE CONNECTING OR
DISCONNECTING EXTERNAL POWER" shall be attached to the plug end of each trainer power
cable. Another warning plate with same legend shall be placed near the master-keyed lock switch.
contents, and the words MUST BE
3.3.3.16 Fluid tank or reservoir.
The liquid capacity
DRAINED PRIOR TO SHIPMENT shall be stenciled on any trainer fluid storage tank or reservoir.
When hard outer covers are provided, one corner of
3.3.3.17 Cover assembly installation.
the cover and a corresponding point on the trainer base panel shall be appropriately marked to
indicate the correct installation of the cover assembly.