Click here to make tpub.com your Home Page

Page Title: Table I - Acceptance Test Plan for Antenna Bore Sight Test Set
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-85027(AS)
TABLE I
ACCEPTANCE TEST PLAN FOR ANTENNA BORESIGHT TEST SET
TS-3568( )/AWM-23(V)
4.2.6 Test results.  The contractor shall present
test data, as documented evidence that the ABTS has
completed tests, as applicable.  Test indications shall be
recorded on test data sheets by the responsible contractor
test engineer and inspected by contractor Quality Assurance
(QA).  A record shall be kept of all failures.
Upon completion of Government
4.2.7 Acceptance.
inspection, Government acceptance will be consummated by CGI
execution of the DD Form 250.
Forced-air-cooling, electrical
4.2.8 Utilities.
power consumption, water, nitrogen, compressed air, and
forced liquid cooling performance are facilitities
requirements and need not require verification as conditions
of acceptance.  The contractor may use his facilities
providing they are within the required tolerances of 3.2.2.
4.2.9 Configuration.  Not applicable.  The physical
configuration of the ABTS during acceptance shall be in
accordance with Drawing 493720-1XX.
4.3 Tests
4.3.1 Electrical and electronic items - operational
run-in tests.  Not applicable.
4.3.2 Mechanical items.  As specified in the
acceptance test plan, the ABTS shall be inspected for
conformance to drawings.