Click here to make tpub.com your Home Page

Page Title: Preparation for Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-85068(AS)
4.3.2.2
Scope of Test - Special tests shall consist of such tests as are
selected by the procuring activity. Only such tests that are required to check the charac-
teristics in question need be conducted.
4.3.3
Equipment Failures - Should a failure occur during any tests of
Section 4.0 the following action shall be taken:
a. Determine the cause of failure.
b. Determine if the failure is an isolated case or design defect.
c. Where practical, include a test in the individual test to check
all equipment for this requirement until assurance is obtained
that the defect has been satisfactorily corrected.
4.4
Test Procedure - Preproduction test, acceptance tests and environ-
mental qualification tests shall be performed in accordance with a test plan shall be prepared
by the contractor. MLL-T-18303 shall be used as a guide for preparation of test procedures.
4.5
Rejection and Retest - Equipment which has been rejected may be
reworked or have parts replaced to correct the defects and may be resubmitted for unit
acceptance.
4.6
Environmental Qualification Test - The contractor shall perform
an environmental qualification test. Test limits, levels and other qualifying conditions shall
be as specified in paragraphs 3.4.5 and 3.4.6 of this specification.
5.
PREPARATION FOR DELIVERY
5.1
General - All units and parts of equipment shall be preserved,
packaged, packed, and marked for the level of shipment specified in the contract or in
accordance with MIL-E-17555.
6.
NOTES
Intended Use - These equipments shall be designed as portable
6.1
units housed in combination cases. Unit dimensions, weight and handles shall be consistent
.
with  intended usage as portable PGSE for organizational maintenance applications.
6.2
Source Data- The technical content of this specification has been
established by information contained in the following unclassified sources of data:
NAVAIR 01-245FDN-2.8.5 Technical Manual
NAVAIR 16-30APQ72-6-1 Technical Manual
-21-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business