MIL-T-85395(AS)
tract. First article test performance shall be the responsibility
of the
contractor and shall be performed in accordance with approved test
procedures
No first article inspections shall be conducted prior
to
(see 4.8).
acceptance of the first article test procedure by the contracting
officer.
4.4.1 First article test data.
The contractor shall make available to the
procuring activity all data collected in conducting these tests (see 6.2.2).
On first production contracts, this data shall include a list of all
electrical and electronic parts giving their specified voltage, and ambient
and surface temperatures.  The ambient and surface temperature shall be
obtained under the extreme high temperature operating condition.
4.4.2 Scope of first article tests.  First article tests shall include all
tests deemed necessary by  the procuring activity to determine that the test
set meets all the requirements' of this-specification and the contract.
These shall include environmental and interference tests in accordance with
MIL-T-5422 as specified in MIL-T-28800.  Test methods shall be in accordance
with MIL-STD-81O except as modified by this specification.
4.4.3 First article approval.
Approval of the first article shall be by the
procuring activity upon the contractor meeting the requirements of all tests
and making available the first article test report.
No production test sets
Prefabrication
shall be delivered prior to the approval of the first article.
of production equipment prior to the approval of the first article is at the
contractor's own risk.  The approved first article sample shall be retained by
the contractor for his use in the fabrication and testing of test sets to be
submitted for acceptance.  The first article sample shall not be considered as
one of the deliverable test sets under the contract.
4.4.4 Production test sets.
Test sets supplied under the contract shall, in
all respects including design, construction,
workmanship, performance and
quality, be equal to the approved first article sample. Each test set shall
be capable of successfully completing the same tests as imposed on the first
article sample.  Evidence of non-compliance with the above shall constitute
cause for rejection of a test set and of a test set already accepted by the
The contractor shall make necessary corrections as approved by
Government.
the procuring activity.
4.5 Quality conformance inspection.  The contractor shall furnish all samples
All
and shall be responsible for accomplishing the quality conformance tests.
inspection and testing shall be to the approved quality conformance test
procedures under the supervision of the Government inspector. The contractor
shall make available test reports showing quantitative results for all quality
conformance tests (see 6.2.2).
Such reports shall be signed by an authorized
representative of the contractor or laboratory as applicable.  Quality
conformance or approval of material during the course of manufacture shall not
be construed as a guarantee of the acceptance of the finished product. Tests
shall consist of the following:
Individual tests (see 4.5.1)
a.
b.
Sampling tests (see 4.5.2) or reliability assurance tests (see
4.5.3)