Click here to make tpub.com your Home Page

Page Title: First article inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-U-17293D(SH)
specified below shall be delivered by the contractor in accordance with the
contract or purchase order requirements.  Deliverable data required by this
specification is cited in the following paragraphs.
Applicable DID no.
Paragraph no. Data requirement title
Option
Microfilming of
DI-E-20477
Microfilming of
3.8
drawings on aper-
engineering documents,
ture cards - type I,.
35 mm and PCAM,
class 1 delivered
preparation, micro-
to Portsmouth, NH,
film aperture card
and type II, class 2
delivered to NAVSEA
Level 3, Design
DI-E-7031
Drawings, engineering
3.8.1
activity desig-
and associated lists
nation - contractor
Drawing No -
contractor
----
UDI-H-26378
3.8.2
Safety system check
I
list
----
UDI-T-4902
4.7
First article in-
spection report
----
UDI-T-23753
Equipment shock test
4.7
report
----
UDI-T-23762
Vibration testing
4.7
report
----
DI-R-3544
Reliability maintain-
4.7
ability assessment
and demonstration
reports
(Data item descriptions related to this specification, and identified in
section 6 will be approved and listed as such in DoD 5000. 19L., Vol. 11, AMSDL.
Copies of data item descriptions required by the contractors in connection with
specific acquisition functions should `be obtained from the Naval Publications
and Forms Center or as directed by the contracting officer.)
6.2.2.1 The data requirements of 6.2.2 and any task in sections 3, 4 or 5
of this specification required to be performed to meet a data requirement may be
waived by the contracting/acquisition activity upon certification by the offeror
that identical data were submitted by the offeror and accepted by the Government
under a previous contract for identical item acquired to this" specification.
This does not apply to specific data which may be required for each contract
regardless of whether an identical item has been supplied previously (for example,
test reports).
6.3 First article inspection.  Invitations for bids should provide that
the Government reserves the right to waive the requirement for samples for
first article inspection as to those bidders offering a product which has been

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business