Click here to make tpub.com your Home Page

Page Title: Table IV. Preproduction Test Sequence
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-V-82444A(OS)
4.4 Preproduction inspection
*
4.4.1 Test and examinations.  The preproduction sample of 12 valves
shall be inspected-in accordance with Table IV, with 2 valves being tested
in accordance with each of the 6 test sequences, A through F.  In addition,_
the sample quantity of 25 squibs shall be subjected to the tests detailed
in 4.5.7 through 4.5.7.5.
TABLE IV
PREPRODUCTION TEST SEQUENCE
4.4 Test conditions.  Unless otherwise specified, the valves shall
be subjected to the tests in 4.4.1 under the following conditions:
Room ambient +32 F to +98 F
a.
Temperature:
Normal ground atmospheric pressure
b.
Altitude:
c.
Vibration:
None
d.
Humidity:
Room ambient
4.4.3 Test equipment and setup. In addition to the items listed
in 4.5.5., test equipment is required which provides the following
characteristics:
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business