Click here to make tpub.com your Home Page

Page Title: Quality conformance verification inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-V-85830(AS)
4.5  Quality conformance inspection,  Quality conformance inspection shall
consist of all the examinations and tests specified in Table III. The
sampling and Inspection levels shall be as specified In MIL-STD-105.
4.5.1 Inspection lot. An inspection lot size shall be expressed in units
of one ventilator made by one manufacturer under essentially the same
conditions and from the same materials and components.
4.5.1.1 Packaging.  An inspection lot size shall be expressed in units of
one fully prepared shipping container, containing ventilators, fully prepared
for delivery, made from essentially the same materials and components.  The
sample unit shall be one shipping container, containing ventilators, fully
prepared for delivery, with the exception that the shipping container need not
be sealed.
4.5.2 Sampling for tests and examinations of ventilators.  The sample
size, acceptance criteria, tests and examinations required for the ventilators
shall be as specified in Table III.
4.6  Quality conformance verification inspection.  At the option of the
Government and upon completion of the quality conformance inspection
requirements of 4.5, a random sample, one for every 150 or fraction thereof,
shall be selected from each lot of ventilators (see 6.2.1).  Each ventilator,
selected as a sample unit, shall be forwarded to a laboratory designated at
the time of the award.  The designated laboratory shall conduct any or all the
tests and examinations of 4.8 of this specification. The serial numbers of
the units in the lot, represented by the sample units, shall be included with
the data accompanying the samples to the laboratory. The Government activity
responsible for conducting the quality conformance verification program shall
report the results of the tests and examinations to the designated inspection
Final
and acceptance activity specified in the acquisition document.
acceptance of the lot from which the sample units were selected shall be based
upon successful completion of the inspection program by the cognizant Quality
Assurance Representative/ Specialist at the contractor's facility; applying
the applicable acceptance criteria specified in Table III.
4.6.1 Rejected lots.  If an inspection lot is rejected, the manufacturer
may rework it to correct the defects, or screen out the defective units, and
resubmit for reinspection.  Resubmitted lots shall be inspected using
tightened inspection and shall not thereafter be tenderd for acceptance unless
the former rejection or requirement of correction is disclosed. Such lots
shall be separated from new lots and shall be clearly identified as
reinspected lots.
4.7 Test conditions.
4.7.1 Temperature and pressure.  Unless otherwise specified In the
contract,  inspections shall be conducted at local ambient temperature and
barometric pressure.  Corrections shall be made to provide agreement with the
temperature and pressure calibration of the instruments. Inspection data
provided by an instrument not calibrated to normal temperature and pressure
(NTP) conditions shall be corrected to determine NTP conditions.  NTP
conditions are 70F and 29.92 in. Hg.
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business