MIL-W-14969 (MU)
4.4.8 Salt Spray Test (see 4.3.3.6), - An accelerated corrosion
test shall be performed utilizing the equipment and procedures pre-
scribed by the Federal Test Method Standard No. 151, Method 811.
A 20 percent concentration of sodium chloride solution shall be
used and length of the test shall be for 144 hours.  Actual produc-
tion warhead assemblies only shall be subjected to this test.
Test panels shall not be substituted for the warhead assemblies.
The test specimen shall be air dried for a minimum of 96 hours
before testing.  The painted specimen shall be scored through
using a sharp knife.  The specimens shall then be exposed to the
20 percent salt spray as specified in Federal Test Method Standard
No. 151, Method 811.
PREPARATION FOR DELIVERY
5.
5.1 Packaging and marking-Level C. - The warhead shall be
packaged and marked in accordance with Drawing 7548604.
5.2 Packing and marking-Level C. - The packaged warheads
shall be packed and marked in accordance with Military Specification
MIL-P-10025,
6.
NOTES
6.1 Ordering data. -Procurement documents shall specify the
following:
a.  Title, number and date of this specification.
b.  Data cards. - Data cards shall be prepared for
each lot in accordance with the information specified in
Standard MIL-STD-1167.
6.2 Inspection code numbers. -The five digit code numbers
assigned to the inspections herein are to facilitate future data
collection and analysis by the Government.
6.3 Inspection equipment. - The contractor shall design
inspection equipment required by the referenced inspection
Equipment Lists (EL) in accordance with the instructions of
paragraphs 6.3.1 through 6.3.5.
6.3.1  Inspection equipment lists. - Inspection equipment
lists indicate the availability of inspection equipment designs
by showing in the "number" column of the list of inspection
equipment (Form SMUPA 1010) the numbers of drawings or Federal
Stock numbers of existing equipment designs, or codes as indi-
cated in paragraph 6.3.2.  Design action required of the con-
tractor Is described in paragraphs 6.3.3 and 6.3.4, The con-
tractor will be required to prepare detailed drawings in accor-
dance with 6.3.4 for all the equipment coded as "Contractor
Design" in the number column.  These contractor designs must
13