Click here to make tpub.com your Home Page

Page Title: Functional testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-W-43001F
(c) Low extraction speed inoperative or intermediate positioning cycle
inoperative (when applicable) (see 3.5 and 3.5.2.8).
(d) The operation of the safety switch, timers, limit switches, remote
control pushbutton switches, signals and indicating lights, in the motor control
circuit for compliance with the requirements of 3.5.1.2.
(e) Reversal of cylinder rotation for compliance with the requirements of
3.5.1.3.
(f) The machine, including the shell, door, discharge valve, water inlet
valves, supply injection valves, for leaks or improper operation.
(g) Functioning of automatic controls for compliance with the require-
ments of 3.5.1.4, (a) through (m) and 3.5 through 3.5.3.8 (as applicable).
(h) Operation of flushing system and tank capacities for compliance with
the requirements of 3.5.1.6.
(i) Operation of shell door, steam valve, and drain valve interlocking
devices for compliance with the requirements of 3.5.1.8.
(j) Operation of the shell door(s) and brake interlocking devices for
compliance with the requirements of 3.5.1.8 and 3.5.3.1.
(k) Operation of the cylinder doors for compliance with the requirements
of 3.5.2.7.2 (side loading machines only), and 3.5.3.1 (when applicable).
(1) Cylinder speeds for compliance with the requirements of 3.5.2.8,
(m) Inching or positioning of the cylinder for compliance with the
requirements of 3.5.2.9 (divided cylinder machines only), and 3.5.3.1 (when
applicable).
(n) Operation of the brake interlock switch for compliance with the
requirements of 3.5.2.11.
(o) Operation of visual and audible signals for compliance with 3.5.3.2.
(p) Measurement of each cylinder door cross sectional area for compliance
with the requirements of 3.5.4.1.
Failure to pass any of the above tests shall be cause for rejection.
4.6.2 Functional testing  The washer-extractor shall be tested by making the
necessary connections such as electric power, compressed air, steam, hot and
cold water, and operated under full service load as established in the appli-
cable paragraphs of this document.  The following items and operations shall be
checked:
27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business