Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-A-21165A
4. QUALITY ASSURANCE PROVISIONS
Responsibility for inspection - Unless otherwise specified
4.1
in the contract or purchase order, the supplier is responsible for the
performance of all inspection requirements as specified herein.  Except
as otherwise specified, the supplier may utilize his own facilities or any
commercial laboratory acceptable to the Government.  The Government reserves
the right to perform any of the inspections set forth in the specification
where such inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
Classification of inspection - The examination and testing
4.2
of . the adapters shall be classified as follows:
(a) Preproduction inspection - Preproduction inspection
consists of examinations and tests performed on
adapters which are representative of the production
item after award of a contract to determine that the
production item meets the requirements of this
specification,
(b) Quality conformance inspection - Quality conformance
inspection consists of examinations and tests per-
formed on individual products or lots to determine
conformance of the products or lots with the require-
ments set forth in this specification,
Preproduction inspection - The preproduction inspection
4,3
of the adapters shall consist of examinations and tests for all the require-
ments of this specification,
4.3.1
Preproduction samples -
Applicable to the Bureau of Naval Weapons - Unless other-
4.3.1.1
wise specified; as soon as practicable after award of the contract or
order, the manufacturer shall submit twelve adapters of the MS part number
contracted for, three for each of the three strength tests, and three
adapters for the vibration and endurance tests.  The samples shall be
representative of the construction, workmanship, components> and materials
to be used during production,  When a manufacturer is in continuous pro-
duction of these adapters from contract to contract, submission of further
preproduction samples on the new contract may be waived at the discretion
of the procuring activity.  Approval of the preproduction samples or the
waiving of preproduction inspection does not preclude the requirements of
submitting to the quality conformance inspection.  The preproduction sam-
-
pies shall be forwarded to the Supply Officer, Naval Air Engineering
Center, Philadelphia, Pennsylvania 19112, Attention: Director, Aerospace
Crew Equipment Laboratory.  The samples shall be plainly identified by
securely attached durable tags marked with the following information:
Sample submitted by (name) (date) for preproduction
inspection in accordance with the requirements of
MIL-A-21165A under Contract NO.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business