Click here to make tpub.com your Home Page

Page Title: Other publications
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-A-21430B(OS )
2.2 Other publications.  The following document forms a part of this
specification to the extent specified herein,  Unless otherwise indicated,
the issue in effect on date of invitation for bids or request for pro-
posal shall apply.
NATIONAL BUREAU OF STANDARDS
Handbook H28
Screw Thread Standards for the Federal Services
(Application for copies should be addressed to the Superintendent of
Documents, Government Printing Office, Washington 25, DC 20402.)
3.
REQUIREMENTS
3.1 Description.  The components of Accessory Set Mark 1 Mod 1 are
used, individually, with Test Set Mark 127 in performing load, no-load,
continuity and leakage resistance tests on batteries used in underwater
mines.  The adapters (see 1.2 (b)) incorporate load resistors and meter
multiplier resistors to adapt Test Set Mark 127 to the particular battery
under test.
*
3.1.1 The following tabulation is a cross reference of each component
(see 1.2) and the battery with which it is associated.
COMPONENT
BATTERY
Cable Assembly
CA-55
Mark
111
Mod
1
Cable Assembly
CA-57
Mark
112
Mod
1
Cable Assembly
CA-58
Mark
113
Mod
O
Cable Assembly
CA-90
Mark
109
Mod
1
*
Cable Assembly
CA-91
Mark
110
Mod
1
Cable Assembly
CA-796
Mark
106
Mod
O
Cable Assembly
CA-797
Mark
105
Mod
O
Cable Assembly
CA-799
Mark
108
Mod
O
*
Cable Assembly
CA-1321
Mark
116
Mod
1
Adapter, Test,
Mark 21
Mod
O
Mark
121
Mod
O
Adapter, Test,
Mark 26
Mod
O
Mark
114
Mod
O
Adapter, Test,
Mark 28
Mod
O
Mark
115
Mod
1
Adapter, Test,
Mark 38
Mod
O
Mark
117
Mod
O
3.2 General requirements.
3.2.1 First article sample.  Unless otherwise specified in the contract
or order (see 6.2), a first article sample of the accessory set is
required and shall be manufactured using the methods and procedures
proposed for production.  The sample shall be tested as specified in
Section 4 for the purpose of determining that, prior to starting production,
the contractor's production methods are capable of producing items that
comply with the technical requirements of the contract (see 4.3.1).
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business